Lokale opslag lijkt te zijn uitgeschakeld in uw browser.
Voor de beste gebruikservaring, moet u lokale opslag inschakelen in uw browser.

Carmo is vanwege de feestdagen gesloten van dinsdag 24 december t/m 2 januari. Webshopbestellingen worden vanaf 2 januari verzonden.
Kawasaki ZXR750 CDI TCI ECU igniter module (J4T03471, 21119-1314)

Kawasaki ZXR750 CDI TCI ECU igniter module (J4T03471, 21119-1314)

Kawasaki ZZR1100 (21119-1284, 131800-0160; 21119-1303, 131800-0170) CDI ECU igniter module

Kawasaki ZZR1100 (21119-1284, 131800-0160; 21119-1303, 131800-0170) CDI ECU igniter module

Kawasaki ZXR750 ZXR750R (21119-1328, J4T03571, 21119-1330 J4T03572) CDI TCI ECU igniter module

Beschikbaarheid: Op voorraad
Model
Kawasaki ZXR750 ZXR750R (21119-1328, J4T03571, 21119-1330 J4T03572) CDI TCI ECU igniter module Research / Repair
SKU
CARU-KA-ZXR750-ZXR750R-21119-1328-J4T03571-1330-J4T03572
€ 195,00 € 161,16
  •  Dit is een reparatie service voor uw apparaat.
  •  De vermelde prijs is de reparatieprijs.
  •  If we can repair it, this is the price. (Without any additional prices like Quick-Service)
  •  If we are not able to find the fault in the unit, we will only charge research costs,
  •  Met uitzondering van producten die standaard worden gereviseerd.

Kies wat u wilt doen:
 Ophaal Service  Stuur het zelf op

CLICK HERE, for downloading the Test/Repair form (PDF)
or as Word document (DOC)



Testing Ignition unit

You pay this amount if your unit has been tested by Carmo.
Testing within 3 working days.
(We also offer a fast service, with delivery by 10:00, ready after 16:00 Mon-Fri)

Test procedure:
Our tests are Simulation-based tests, all signals that are offered to the unit are simulated on our unique test table.
This way we can approach the reality close to 100%. We test dynamic, not static measures such as using tables from the workshop manual.

What is tested?:
- Variable load on outputs
- Advance ignition curve relative to the rpm
- Power of the spark at variable load
- Charging of the ignitioncoil in TCI systems and peak voltage at CDI Systems
- Operation at different voltages (8V - 15.5 V)
- Temperature dependence
- Idle up to the rpm limiter
- Endurance test, at least 25 minutes (longer on request)
- Vibration
- Water resistance
- Electromagnetic compatibility tests
- If present, tachometer output, Electronic fuel pump output, TPS and vacuum input, standard / neutral safety

If possible, the circuit board will be provided with two layers of professional moisture protective coating after testing.

Team-Carmo


Schrijf uw eigen review
Alleen geregistreerde gebruikers kunnen reviews schrijven. Log in of maak alstublieft een account aan. inloggen of maak een account aan